Basic Info.
Surface Material
PE Film/ Sand / Granule/ Aluminum Foil
Reinforcement Material
Polyester Mat / Fiberglass Compound Base Mat
Type
Waterproof Roll Material
Ceiling Tile Shape
Rectangle
Surface Treatment
Film Coated
Function
Anti-static, Heat Insulation, Sound-Absorbing, Waterproof, Self Adhesion
Usage
Outdoor, Indoor, Roof, Waterproof
Ceiling Tile Type
Polyester Base Mat
Transport Package
Shrinked Plastic Film & Pallet
Product Description
Self Adhesive Bitumen Roofing Underlayment
Self adhesive bitumen roofing underlayment consists of bitumen as its main component, SBS, SBR and tackifying resin as its modifier and polyester as its reinforcement. Its upper surface is covered with polyethylene(PE) film, sand or strippable silicon film and its under surface is covered with split released film.
Specifications:
Surface | Natural silver or colored aluminum foil / HDPE film / EVA film / PVC membrane / non-woven + PE film / Double adhesive ... |
Width | 100cm |
Length | 10m / 15m / 20m |
Type / Thickness:
Type N ( without reinforcement ) | 1.0mm / 1.2mm / 1.5mm / 2.0mm |
Type PY ( with polyester reinforcement ) | 1.5mm / 2.0mm / 3.0mm / 4.0mm |
Type NK ( with fiberglass compound base mat ) | 1.2mm / 1.5mm / 2.0mm / 3.0mm / 4.0mm |
Data Sheet:
self adhesive bitumen waterproof memrbane asphalt flashing roofing felt
self adhesive bituminous flashing roll flat roof underlayment
Features:
Easily and fast applied, good adhesion, torch and glue agent are not needGood rubber elasticity, with good elongation, easily adpoted to the crack and distortionGood self-heal, anti-corrosion, acid-resisting, alkali-resisting, anti-agingSafe construction, no pollutionGood weather resistance, can be applied over a wide temperature range
Use Scope:
self adhesive bitumen waterproof memrbane asphalt flashing roofing felt
The self adhesive modified bitumen waterproof membrane is widely used in the industrial and civil building,such as roof,basement,bridge,roof garden,tunnels,water dams,etc.
Especially used in cold areas due to its good low temperature flexibility.
Construction procedure and attention:
1)Basic cleaning
Clean up debris, level off if there are sharp bump, it may construct without water , moisture is allow.?
2)Pave the waterproofing sheet membrane
spread over the waterproof sheet membrane with the particles facing on the basement,When paving the adjacent sheet membrane. pay attention to overlap the edge alignment to keep the overlap without any gap.
3)overlap joint waterproof sheet membrane
(1) overlap waterproof sheet membrane:Tear off the Isolation membrane of the Double-side self-adhesive of polymer down surface,Remove tape rolling again after isolation film on the surface,And connected to the coil will take to paste on the tape, strong crush of binding, when necessary to tape appropriate heating, paste the effect is more ideal.more adept to dry conditions shall apply.
(2) overlap joint waterproofing sheet membrane: Shovel glue stick tape after lap, this approach is applicable to the waterproof layer may be rain water.
(3) Butt joint waterproof sheet membrane :Docking coil binding material adopt DNM coil,Coil cut into strip and place the glue face up, trea off the surface after isolation membrane, paste the upper butt of the coil, and strong crush of binding. the approach is suitable for the waterproof layer may be rain water, can avoid so release.
4)Seal the deal:?DNM roll angle of yin and Yang and the node does not need additional layer construction, but large coil shop paste is completed after node to deal with the details of the structure is complete and the tightness of the check processing, aiming at the pile head on the floor of the basement, bolt, drains and other details, should adopt consolidates with adhesive tape, then brush waterproof coating to seal the deal.
5)organization acceptance
6)Subsequent construction: to complete the construction of waterproof layer, can be reinforced concrete binding.d isolation layer-----After membrane laying, construct protection and isolation layer according to waterproof layer design.
Storage:Store in a cool and dry area,away from the direct sunlight.Keep ventilation.Different type and specification should be stacked separatelyThe storage temperature should below 50 Degree Celsius Must not expose to petrol,white spirit,paraffin and similar organic solvents which will dissolve the bitumenContact information:
Company profile:
Choice-Link offers a range of high quality waterproofing solution-based products especially foe the prefessional .Our main products including:
SBS/APP modified bitumen waterproofing membranesSelf adhesive bitumen waterproofing membranesSelf adhesive bitumen flashing tapeSelf adhesive butyl waterproofing tapePVC/TPO/HDPE/EVA waterproofing membranes Polymer compound waterproofing membranesLiquid bitumen coating
Our company also export Dimple drainage board, Non woven polyester mat and Glassfiber mesh compound mat for bitumen membranes,Glassfiber mesh,Modified bitumen membrane production lines,etc.
Address:
No. 301, Guangyao Shengdi Building, Wensheng Street, Shouguang City, Weifang, Shandong, China
Business Type:
Manufacturer/Factory, Trading Company
Business Range:
Construction & Decoration, Industrial Equipment & Components
Management System Certification:
ISO 9001, ISO 14001, OHSAS/ OHSMS 18001, QC 080000
Company Introduction:
Our company offers a range of high quality waterproofing solution-based products especially for the professional. Our main products including: SBS/APP modified bitumen waterproofing membranes, Self Adhesive Bitumen waterproofing membranes, Self adhesive Bitumen Flashing Tape, Self adhesive butyl waterproofing tape, PVC/TPO/HDPE/EVA waterproofing membranes, Polymer compound Waterproofing Membrane, Liquid bitumen coating, etc, our company also export Non woven polyester mat for bitumen membranes, Glassfiber mesh compound mat for bitumen membranes, Glassfiber mesh, Modified Bitumen Membrane production lines, etc
Honest is our business policy, quality and service first.
The key of the successful activity in the high quality of research and controls before, during and after production.