Basic Info.
Surface Materials
Sand/Mineral/PE Film/Alum
Low Temperature
-15 Degrees
Product Name
Torch Applied Sbs Modified Bitumen Waterproofing
Type
Waterproof Roll Material
Ceiling Tile Type
Fiberglass Ceilings
Surface Treatment
Film Coated
Function
Anti-static, Heat Insulation, Sound-Absorbing, Waterproof
Transport Package
Package in Roll or with Pallets
Specification
2mm/3mm/4mm/5mm
Product Description
torch applied SBS modified bitumen waterproofing membrane
Bitumen waterproof membrane have modified asphalt by resin (Flexible powder), on both sides have isolate materials sand, mineral PE film,aluminum foil and with the base cloth PY (polyester mat), G (fiberglass mat), NK (compound base), PYG (Glass fiber reinforced polyester mat).
Specification
torch applied SBS modified bitumen waterproofing membrane
Other name of this materials | Bitumen membrane/Bitumen rolls/asphalt rolls /SBS rolls/APP Rolls /Roofing felt |
Thickness | 2mm, 3mm, 4mm, 5mm |
Width | 1M |
Length | 10M, 7.5M or customized |
Surface Mateirals | PE film, sand, Mineral, Aluminum foil |
Characteristic
torch applied SBS modified bitumen waterproofing membrane
a)Good performance in Good impermeability ,anti-puncture, anti-broker, anti-resistance, anti-erosion, anti-mildew, anti-weathering
b)Possess good tensile strength, elongation rate and size stability which could be well suited the substrate distortion and crack
Bitumen waterproof membrane is suitable for industrial and civil architecture roofing, basement, toilet waterproof moisture-proof, and Bridges, car parks, swimming pools, tunnels, reservoirs, such as the structure of the waterproof. Particularly suitable for hot area and structure deformation frequent building waterproof. Products can be according to the different architectural design should adopt suitable for single or double waterproof structure. The period of validity can be up to 10 years.
requirements for construction:
1.The base should be dry and clean. Do not work in the rainy or snowy day.
2.Do not work under heavy wind(above 5 grade)
3.Unsuitable for construction below 5°C
4.If it is rain or snow in the process of construction, protective measure to the laid membrane is must.
5.All the workers should put on special uniforms to keep safe when installing. There should be equipments for fire controls.
There are two methods in application:
a) One way is by heating and melting method.Heat the polyethylene film of the membrane and roof deck surface by heating and melting method to be nearly melted (not flowing),then install the membrane filly bonded to the roof deck with overlaps of 5-10cm.
b) The other way is by cold adhesive method.Pour the cold adhesive homogeneously on the roof deck, then roll the membrane to install it to be fully sticked to roof deck.
By heating and melting method and by cold adhesive can be used in alternation in application as requested.
c)After application,a full serious inspection is required to sure no air bubble,no falling away.etc. to guarantee the waterproof life.
Details of construction
torch applied SBS modified bitumen waterproofing membrane
The special formulation of fire enables the membrane to be applied directly with primer. This application is named as "Torched on application".
1.Base processing: the base surface musts be clean,solid,level,dry;no grit,rift and loosing dust. For a large recess, fill it with cement mortar and then level it. Remove the protrusion and clean dust If working on base slab or lateral face,water lowering should be done.
2.Painting primer before laying the membrane, clean the dust on the surface of concrete base with dust catcher or dust-blower; then paint entirely with treatment agent of DY primer for waterproofing(for purpose of dust consolidation and high adhesive effect).
3.Heat to melt: place membrane correctly, fire torch, heat the membrane with base entirely, when the surface of the membrane is black and bright with a fusion layer, apply the membrane and press it into a solid and flat state.Before the membrane is cool, seal the edge of joint by float.
4.Requirements for lapping: There should be less than 3 layers of lapping, with the joint seams appearing as"T" type,avoid 4 layers of lapping.The width of longitudinal lapping is between 50 and 80mm,and of end-lap joint 100mm
5.Use a roller to push hard the membrane surface to ensure it stick firmly.
Address:
No. 301, Guangyao Shengdi Building, Wensheng Street, Shouguang City, Weifang, Shandong, China
Business Type:
Manufacturer/Factory, Trading Company
Business Range:
Construction & Decoration, Industrial Equipment & Components
Management System Certification:
ISO 9001, ISO 14001, OHSAS/ OHSMS 18001, QC 080000
Company Introduction:
Our company offers a range of high quality waterproofing solution-based products especially for the professional. Our main products including: SBS/APP modified bitumen waterproofing membranes, Self Adhesive Bitumen waterproofing membranes, Self adhesive Bitumen Flashing Tape, Self adhesive butyl waterproofing tape, PVC/TPO/HDPE/EVA waterproofing membranes, Polymer compound Waterproofing Membrane, Liquid bitumen coating, etc, our company also export Non woven polyester mat for bitumen membranes, Glassfiber mesh compound mat for bitumen membranes, Glassfiber mesh, Modified Bitumen Membrane production lines, etc
Honest is our business policy, quality and service first.
The key of the successful activity in the high quality of research and controls before, during and after production.